Enter your survey exit date and the date you received the CMS-2567 to see your Plan of Correction and IDR request deadlines, the 23-day IJ date, and the 3-month and 6-month mandatory remedy dates.

Build your planning timeline

No account required. Inputs stay in this browser; nothing is stored or sent.

Was Immediate Jeopardy (IJ) identified?

Start with the survey exit date

Then add your CMS-2567 receipt date to calculate POC and IDR dates. Agency notices control actual deadlines.

How these dates work

A Plan of Correction is generally due 10 calendar days after receipt of the CMS-2567. The agency transmittal controls the exact date and submission method, including ePOC. The calculator uses local calendar dates, not business days. Calendar-month calculations clamp to the last day of a shorter month: November 30 plus three months is February 28, or February 29 in a leap year.

Under SOM Chapter 7, section 7212, request IDR in writing, identifying specific disputes, within the same 10-day period. IDR does not delay the POC or enforcement remedies.

Enforcement dates are not waiting periods

If Immediate Jeopardy is not removed, the 23-day date concerns termination or a temporary manager under 42 CFR 488.410(a). Remove IJ much sooner following agency instructions.

Mandatory denial of payment for new admissions (DPNA) applies at three calendar months if the facility is not in substantial compliance, under 488.417(b)(1) and 488.412(c). Termination applies at six calendar months if still noncompliant under 488.412.

Remedies, including civil money penalties, may begin before three months. Notice is generally two calendar days for IJ and 15 otherwise under 488.402(f). Mandatory DPNA also applies when the last three consecutive standard surveys found substandard quality of care under 488.417(b)(2).

Formal appeals are a separate process

Formal HHS Departmental Appeals Board appeals generally have a 60-day period after receipt of the notice under 42 CFR 498.40. Confirm the appeal rights, date, and instructions in the actual letter. An IDR request is not a formal appeal.

Use the timeline with evidence

Calendar the CMS-2567 receipt date and retain the transmittal. Build your response from evidence, choose realistic completion dates, and retain records for review or a revisit. Use the Survey Tracker for survey context and the POC generator as a drafting aid.

No login is needed. Dates are calculated only in this browser and are never stored or sent. Each calendar download is created locally as an all-day event. With JavaScript disabled, this explanatory guidance remains available, but interactive calculation and downloads require JavaScript.

Frequently asked questions

Are these calendar days or business days?

Calendar days. Your agency letter controls the actual deadline and submission instructions.

Does IDR extend the deadline?

No. IDR does not extend the POC deadline or delay enforcement remedies.

What happens at three months?

DPNA is mandatory if the facility is not in substantial compliance. Earlier remedies are possible.

What happens at six months?

Termination applies if the facility remains noncompliant under 42 CFR 488.412.